This is a revolutionnary process in the cleaning field which is totally environmentally safe and which consists in the projection of dry ice pellets (-80°) that leave the surfaces of the different components without damage. All the protection guards are dipped and re-sprayed in a special powder paint. The housings are cleaned, sanded down and re-sprayed in the original manufacturers paint as well as all the footboards which are sand blasted and re-sprayed in a polyurethan paint.
All the water and air tubes and pipes are changed
A final and complete adjustement of the machine is then carried out and print tests are executed with a test form which is specially created for this purpose.
The machines are now ready to be delivered . Then they are dismantled and packed onto specials palets and rust protected if the machine is delivered overseas After, we load carefully and secure the machine on the trucks or container.
|
|---|
|
|